Digital Pictures Index
Manchester

2 Aug 12   Tameside.  A walk to Ashton to check progress on the Metrolink works.  Mostly sunny.


Repairing cracks in the track concrete.


Quite normal though, I'm told.


Pavement laying at Cemetery Road stop, Droylsden.


Thermite welding of the track sections.


Nearly finished at Audenshaw.


Ashton Moss stop on Lord Sheldon Way, Ashton.


Ashton West stop with the Pennines behind.


Near Ashton town centre.


Ashton terminus.


On a wall in Ashton.


· Home Page · Index · What's New ·